COVID-19 Symptom Attestation

Refine

Date

1924 - 1930
(years)
Specify date range: Show
Format: 2020/09/21

Type of content

Genre/form

Object custodian

Result Limit
  • CSV Spreadsheet
  • RSS Feed
(1 - 20 of 1,482)

Pages

Lower Baker River dam construction 1925-02-15
Lower Baker River dam construction 1925-02-26 Run #26 - Horizontal and vertical drains filled in with concrete
Lower Baker River dam construction 1925-03-17
Lower Baker River dam construction 1925-04-25 Downstream Face of Dam
Lower Baker River dam construction 1925-04-25 Concrete Surface Run #84 El.246.8
Lower Baker River dam construction 1925-02-20 Reinforcing Steel over Sluiceways
Lower Baker River dam construction 1925-02-24
Lower Baker River dam construction 1925-02-20 Reinforcing Steel over Sluiceways
Lower Baker River dam construction 1924-08-31 Railroad, shows intake
Lower Baker River dam construction 1924-09-18 (signal sign)
Lower Baker River dam construction 1924-10-31 Railroad bridge
Lower Baker River dam construction 1924-11-11 Cofferdam
Lower Baker River dam construction 1924-12-06
Lower Baker River dam construction 1925-01-19
Lower Baker River dam construction 1925-06-28 Concrete 3rd Floor P.H.
Lower Baker River dam construction 1925-06-20 Downstream Face of Dam
Lower Baker River dam construction 1925-08-13 Rock Surface Run  #187 W. Side
Lower Baker River dam construction 1925-08-10 Rock Surface Run #184 El.307
Lower Baker River dam construction 1925-09-22 Tail Race
Lower Baker River dam construction 1925-09-25 Reinf Steel Intake

Pages