Refine

Date

1912 - 1913
(years)
Specify date range: Show
Format: 2019/12/12

Type of content

Related Collection

Result Limit
  • CSV Spreadsheet
  • RSS Feed
(1 - 20 of 22)

Pages

View from across a field of Equality Farm's multiple buildings on hillside
View from hillside of Interurban tresle spanning Samish Bay
Rubble from blasting of hillside during road construction
Wooden bridge over gorge with whitewater river
Construction of Chuckanut Drive between Oyster Creek and Blanchard
View from above of steam train traveling along railway on mountainside next to shore
Chuckanut Drive construction - forested hillside with large rock blocking path
Four men in suits walk forested hillside path
Log float on Skagit River next to bridge
Trestled railway with dirt road passing underneath
Interurban rail line extended over water with trolley heading south.
Deception Pass view from the northwest before construction of the bridge
Scow derrick on Skagit River with log float and bridge in background
Buttressed supports of Chuckanut Drive from Samish Bay overlook
Great Northern steam train travels south along Chuckanut Mountain
Rock-crushing operation cuts through hillside
Four men in suits and three workmen stand on rocky hilside path
Two-part photograph of Deception Pass Bridge under construction
View through trees and bushes of Skagit River near Burlington, WA
Baker River, towards Mt. Baker

Pages