Refine

Date

1924 - 1930
(years)
Specify date range: Show
Format: 2020/02/27

Type of content

Genre/form

Object custodian

Result Limit
  • CSV Spreadsheet
  • RSS Feed
(1 - 20 of 1,482)

Pages

Lower Baker River dam construction 1925-03-17 Box drain?
Lower Baker River dam construction 1925-03-21 Pipe?
Lower Baker River dam construction 1925-02-24
Lower Baker River dam construction 1925-07-03 4th Floor Power House
Lower Baker River dam construction 1925-07-25 Reinforcing Steel Run #172 El.3845
Lower Baker River dam construction 1925-06-13 Rock Surface E 263 Run #132
Lower Baker River dam construction 1925-06-05 Exciter Base Form
Lower Baker River dam construction 1925-10-08 Stripping at Dam
Lower Baker River dam construction 1925-08-25 Monitor Forms
Lower Baker River dam construction 1924-12-15
Lower Baker River dam construction 1924-10-16 Base of dam
Lower Baker River dam construction 1925-06-23 Placing Concrete Main generator Room Floor P.H.
Lower Baker River dam construction 1925-08-21 Rock Surface Run #195 El.366 E. Side
Lower Baker River dam construction 1924-10-10 Base construction
Lower Baker River dam construction 1925-09-07 Reinf Steel Intake Foundation
Lower Baker River dam construction 1925-05-09 Steel in P.H. S. Wall
Lower Baker River dam construction 1925-06-18 E. Side 2nd Floor
Lower Baker River dam construction 1925-08-12 Reinf Steel Run #186 E. Side
Lower Baker River dam construction 1925-11-12 Spare Turbine Runners
Lower Baker River dam construction 1924-09-23 Lower Cofferdam - Flood area

Pages