Refine

Date

1797 - 2016
(years)
Specify date range: Show
Format: 2019/10/22

Type of content

Topics

Show more

Place Names

Show more
Result Limit
  • CSV Spreadsheet
  • RSS Feed
(1 - 200 of 5,413)

Pages

Lower Baker River dam construction 1925-09-23 Top of Dam
Lower Baker River dam construction 1925-06-03 Reinf Steel & Conduits Power House
Hall of Fame Plaque: Bruce Randall, Football, Basketball, Baseball, Class of 1976
Lower Baker River dam construction 1925-07-08 Floor Beams E. Side 4th Floor
1927 Campus Day: Cleaning Up
Page 24
Jazz Musician
Mount St. Helens.
Hall of Fame Plaque: Mike Vorce, Track and Fielder (Hurdler), Class of 1983
1979 Canada House: Dedication
Lower Baker River dam construction 1925-02-26 Filling in trench
1965 Library: Print-Out
1975 Huxley Off-site Project
Lower Baker River dam construction 1924-09-03 Staging area
Lower Baker River dam construction 1925-06-15 Rock Surface Run #134 El.2695
Lower Baker River dam construction 1924-10-09
1971 Students Skiing
Lower Baker River dam construction 1925-06-15 Rock Surface Run #134 El.2695
1943 Katherine Casanova In Campus School First Grade Office
1920 Bellingham Ticket Office (Preprimary)
Page 74
Page 37
1969 Bond Hall: Snowstorm
1970 Music Annex
Lower Baker River dam construction 1925-06-21 Supt & Foremans Cottages
Lower Baker River dam construction 1925-06-22 3rd Floor Steel Girder P.H.
Page 35
Lower Baker River dam construction 1925-11-06 Intake Gate House
Lower Baker River dam construction 1925-06-11 Reinf Steel & Conduits 1st Floor Power House
1997 Ridgeway Omega
Page 78e
Beatles press conference
Lower Baker River dam construction 1925-06-17 Conduits Generator Room Floor Power House
Page 10
The crater, seen from the pyroclastic flow.
1912 Main Building: Front Looking South
1976 Aerial View: From the West
Lower Baker River dam construction 1925-10-04 Rock Surface Run #230 El.385.5
1965 Old Main: Staircase
Page 72
1950 Homecoming
1946 Campus Day: Pie-Eating Contest
1979 South Campus Renovations
1927 Campus Day: Sitting on Steps
Laundry delivery truck (Sedro Woolley Steam Laundry)
1974 Buchanan Towers
1995 Haskell Plaza
1927 Campus Day: Spectators
Page 60
1966 Ridgeway Sigma: Exterior
Lower Baker River dam construction 1925-06-19 E. Side 2nd Floor
1955 Library: North Doors
Page 23
Lower Baker River dam construction 1925-07-23 Preparing for Concrete Run #170 El.3415
1960 Rain Forest
Woman hiker with Mt. Baker in background
1952 Auditorium-Music Building: Lobby
1939 Edens Hall: Blue Room
Lower Baker River dam construction 1925-05-22 Concrete Surface Run #111 El.294
page 4
Protestors
Lower Baker River dam construction 1925-08-16 Rock Surface Run #190 E. Side El.348
View of Baker Hotel in downtown Bellingham, WA.
1985 Irrigation System Installation
Lower Baker River dam construction 1925-07-21 Storage Battery Room Vents
Lower Baker River dam construction 1925-07-10 Tile Drain E. Wall 4th Floor
Football Trophy: Columbia Football Association Co-Champions, 2000
Track and Field (Women's) Plaque: Northern Eastern District Meet 1st Place, 1972
Page 19
1970 Miller Hall: Classroom
Lower Baker River dam construction 1925-04-06
1952 Commencement: Faculty
1981 Campus View
1968 Fairhaven Complex Construction
Lower Baker River dam construction 1925-07-28 Roof Forms
Lower Baker River dam construction 1925-07-31 Concrete Surface Run #178 El.3775
1960 Edens Hall
Lower Baker River dam construction 1925-03-09
1947 Main Building: Auditorium
1980 Baseball Service Building
Page 85
Viking I - Urban Vehicle
1966 Ridgeway Sigma: Exterior
1971 Student Skiing
Page 45
1900 Senior Class
Lower Baker River dam construction 1925-08-04 Reinf Steel Run #181 El.389
Lower Baker River dam construction 1925-08-06 Turbine #2 North
Lower Baker River dam construction 1925-08-02 Rotor #2 Unit
1985 Dr. Gerald Kraft
1909 Main Building
1952 Auditorium-Music Building: Dedication
1973 Viking I
1968 Aerial View: North Campus
1975 Environmental Studies Building: Interior
Aquaculture cartoon
1925 Tulip Parade
1992 Foundation Phonathon
1963 Old Main Looking Toward Humanities Building
1930 Edens Hall: Kitchen
1969 Miller Hall: Courtyard
Lower Baker River dam construction 1925-05-17 Power House
Lower Baker River dam construction 1924-09-06 Excavation in dam site
Lower Baker River dam construction 1925-10-28 Rock Surface #249
1939 Basketball Team
Lower Baker River dam construction 1925-08-14 Rock Surface Run #188 E. Side El.334
Lumber yard in Fairhaven, WA on Bellingham Bay with multiple buildings and assorted stacks of lumber
Lower Baker River dam construction 1925-09-12 Concrete Surface Run #217 El.418.8
1970 Outdoor Activities
Lower Baker River dam construction 1925-07-29 Roof Forms
Spirit Lake from the air.