Refine

Date

1797 - 2016
(years)
Specify date range: Show
Format: 2019/10/19

Type of content

Topics

Show more

Place Names

Show more
Result Limit
  • CSV Spreadsheet
  • RSS Feed
(1 - 20 of 5,327)

Pages

Lower Baker River dam construction 1925-05-03 Rock Surface W. Side Run #92 El.265.8
Lower Baker River dam construction 1925-02-26 Run #26 - Horizontal and vertical drains filled in with concrete
Lower Baker River dam construction 1925-03-02 Concrete box drains
Lower Baker River dam construction 1925-04-17 Steel I-Beam for Sluiceway Closing Run #76
Page 19
Grant Senour Photographs Album B
Page 38
Page 2
Lower Baker River dam construction 1925-06-04 Placing Reinf Steel W. Wall Power House
Lower Baker River dam construction 1925-05-31 Drain Tile at Power House East Wall
Soccer (Women's) Jersey: #3, Annette Duvall, 1982/1984
View from 12th street, Fairhaven, Bellingham, WA, towards Bellingham Bay and Pacific American Fisheries facilities where a ship is docked
Negative copy of image in watercolor of cemetery scene showing gravestone of James (a.k.a. Jimmy) Tilton Picket, among tall trees
Three workers in wet gear operate the Smith Salmon Butchering Machine at cannery
Women in formal dresses, possibly as part of beauty pageant, stand in row
Two Pacific American Fisheries ships under construction in south Bellingham, WA, surrounded by scaffolding,w ith several workmen and equipment
Elmheim (Roeder house)
1949 Commencement
View of the mountain from near the shore of Spirit Lake.
North Fork Toutle River debris flow, with timber blown down by eruption in background.

Pages