Refine

Date

1924 - 1930
(years)
Specify date range: Show
Format: 2020/04/02

Type of content

Genre/form

Object custodian

Result Limit
  • CSV Spreadsheet
  • RSS Feed
(1 - 20 of 1,482)

Pages

Lower Baker River dam construction 1924-12-15
Lower Baker River dam construction 1924-10-16 Base of dam
Lower Baker River dam construction 1924-10-10 Base construction
Lower Baker River dam construction 1924-09-23 Lower Cofferdam - Flood area
Lower Baker River dam construction 1924-08-21 cofferdam
Lower Baker River dam construction 1924-09-24 Restoration of cofferdam
Lower Baker River dam construction 1924-09-25 Access bridge
Lower Baker River dam construction 1925-05-21 Concrete Surface Run #110 El.287.3
Lower Baker River dam construction 1925-05-22 Penstocks 2N & 2S
Lower Baker River dam construction 1925-05-25 Rock Surface W. Side Run #114
Lower Baker River dam construction 1925-07-03 Placing Concrete N. Wall
Lower Baker River dam construction 1925-04-26 Upstream Face of Dam
Lower Baker River dam construction 1925-05-11 Concrete Surface Run #100 El.287.3
Lower Baker River dam construction 1925-05-15 Gravel Pit
Lower Baker River dam construction 1925-07-12 Concrete Surface Run #159 El.373
Lower Baker River dam construction 1925-07-03 4th Floor Beams
Lower Baker River dam construction 1925-06-26 3rd Floor P.H.
Lower Baker River dam construction 1925-08-09 Unit #2
Lower Baker River dam construction 1925-08-03 Method of Stripping Forms on the Upstream Face of Dam
Lower Baker River dam construction 1925-08-28 Power House

Pages