Result Limit
  • CSV Spreadsheet
  • RSS Feed
(1 - 50 of 8,404)

Pages

An unidentified ship listing on its side, marooned on rocks.
unidentified man sitting below what is probably the hull of a ship, pointing to a spot on the hull
View across lumber yard toward downtown Bellingham,
An unidentified man with a beard in a three piece suit, wearing a turban.
Edwin Ahern - Organist, Avalon Theatre
1955 Campus Day: Picnic
Lower Baker River dam construction 1925-09-07 Insulators
1977 Paul Madison
1972 Peter Dahl
1981 View From Old Main
Three men at early print shop
Lower Baker River dam construction 1925-07-13 Rock Surface E. Side of Dam Run #160
Lower Baker River dam construction 1925-07-09 Bolt Frames 4th Floor
Lower Baker River dam construction 1925-07-15 Concrete Surface Run #162 El.3055
Lower Baker River dam construction 1925-02-15
Lower Baker River dam construction 1925-02-18
Lower Baker River dam construction 1925-02-26 Run #26 - Horizontal and vertical drains filled in with concrete
Bellingham Plywood Corporation
Studio portrait of R.G. Wright in spectacles with suit and tie
Aerial view of numerous log booms in waters of Bellingham, WA, harbor, with Bellingham in upper background
Construction of the brick headquarters of Pacific American Fisheries at 4th and Harris streets, with railroad running adjacent, south Bellingham, WA
School children stand in several rows on steps of school
Unidentified woman
Lower Baker River dam construction 1925-03-10
Lower Baker River dam construction 1925-03-17
Lower Baker River dam construction 1925-10-09 Intake Gate House
Front exterior view of architectural drawing of the four-story victorian Gamwell House, Bellingham, WA
Archie Shiels, President of Pacific American Fisheries
Exterior of elaborate, Queen Anne style mansion of Henry Roeder family, "Elmheim"
Regatta of six sailing skiffs in unidentified location.
Little Squalicum Bridge
Water Storage Tank
Lower Baker River dam construction 1925-09-30 Rock Surface Run #226 El.356
Lower Baker River dam construction 1925-10-07 Concrete Surface Run 233 El.310
Lower Baker River dam construction 1925-10-14 Rock Surface Run #238
Lower Baker River dam construction 1925-12-07 Lake Shannon
Lower Baker River dam construction 1925-12-07 Downstream Face of Dam
Lower Baker River dam construction 1925-11-11 Air Washers
Lower Baker River dam construction 1925-03-30 Downstream Section Elev 190.
Lower Baker River dam construction 1925-05-02 Concrete Surface Run #91 261.3 El.
Lower Baker River dam construction 1925-04 Wire Twisting Machine
Lower Baker River dam construction 1925-05-10 Grounding Cones #2 Unit
Karsten Hemmingsen
Bellingham Airport
Aerial view of the construction of Fairhaven College at Western Washington University.
Schooner Marguerite
Lower Baker River dam construction 1925-06-29 Erecting 4th Floor Walls
Lower Baker River dam construction 1925-06-25 Power House
Lower Baker River dam construction 1925-06-28 Concrete 3rd Floor P.H.
Lower Baker River dam construction 1925-07-06 Concrete Surface Run #153 El.3550

Pages