COVID-19 Symptom Attestation

Refine

Date

1797 - 2021
(years)
Specify date range: Show
Format: 2020/10/31

Type of content

Result Limit
  • CSV Spreadsheet
  • RSS Feed
(1 - 200 of 5,945)

Pages

Holly & Elk Streets and Harris Avenue
Page 10
Page 14
Page 17
Page 18
Page 19
Page 34
Page 35
Page 36
Page 42
Page 44
Page 78a
Page 78b
Page 78c
Page 79
Page 80
Page 67a
Page 67a
Page 68
Page 70
Page 73
Page 59
Page 61
Page 64
Page 65
Page 66
Page 81a
Page 82
Page 84b
Page 84c
Page 87
Page 20
Page 29
Page 31
Page 32
Page 33
Page 74
Page 75
Page 76
Page 78
Page 77
Page 50
Page 51
Page 52
Page 54
Page 55
Negative of entrance to Bellingham Coal Mine with several wooden structures, Bellingham, WA
A small group of hikers move among tall trees in forest near Mt. Baker
Shipyard with large ship under construction, with two teams of horses in the foreground
Harvey Haggard on the trail running in the Mt. Baker Marathon with seven onlookers
Two Pacific American Fisheries ships under construction in south Bellingham, WA, surrounded by scaffolding,w ith several workmen and equipment
Three workers in wet gear operate the Smith Salmon Butchering Machine at cannery
Several two- and four-wheeled wagons parked on a beach with pile-driver and driven piles just off shore
Pacific American Fisheries brick headquarters at Harris and 4th Street
Petersburg (Alaska) marina with many small fishing boats tied to the dock.
Unidentified man, likely Galen Biery, seated with small dog
Group of three women and a man, all unidentified
View of Happy Valley taken from hill on 19th Street above Mill Street and looking down to Mill.
View of the harbor and village (from the water) of Petersburg, Alaska.
Elmheim (Roeder house)
View of what is probably a cannery building in Petersburg, Alaska
Street in unidentified town with a mountain rising to the left at the end of the street
Row of five Troyer Fox steam pressure cookers, manufactured by Seattle Astoria Iron Works
View of marina in Fairhaven with the railroad tracks on the shoreline and Pacific American Fisheries beyond in the middle ground.
View of Bellingham Bay taken from a lumber mill
Whatcom waterway looking south
Catherine D in Bellingham Bay
Men next to grain sacks labelled "Peach Blossum"
Lower Baker River dam construction 1925-02-16 Setting Forms for Run #17 - Trench in concrete (offset)
Lower Baker River dam construction 1925-02-18
Lower Baker River dam construction 1925-03-14
Lower Baker River dam construction 1925-03-04
Lower Baker River dam construction 1925-02-16
Lower Baker River dam construction 1925-03-18
Lower Baker River dam construction 1925-03-21 Looking South of Column #70 - Trench
Lower Baker River dam construction 1925-03-10
Lower Baker River dam construction 1925-03-12
Lower Baker River dam construction 1925-03-17
Lower Baker River dam construction 1925-03-02 Putting in concrete box drains
Lower Baker River dam construction 1925-02-16 Trench in concrete
Lower Baker River dam construction 1925-02-17
Lower Baker River dam construction 1925-02-13 Forms Set for Run#14 - Trench in concrete
Lower Baker River dam construction 1925-02-18
Lower Baker River dam construction 1925-02-13 Top of Forms at Elev.197.3
Lower Baker River dam construction 1925-03-19 Top of Sluiceways 36 1/2ft Section
Lower Baker River dam construction 1925-03-17
Lower Baker River dam construction 1925-03-21 Looking South of Column #69
Lower Baker River dam construction 1925-03-21
Lower Baker River dam construction 1925-03-04
Lower Baker River dam construction 1925-02-28
Lower Baker River dam construction 1925-03-20
Lower Baker River dam construction 1925-03-17 Sluiceway pipe continuation?
Lower Baker River dam construction 1925-03-09
Lower Baker River dam construction 1925-03-07
Lower Baker River dam construction 1925-02-15 Forms for Sluiceways
Lower Baker River dam construction 1925-02-12 Forms up for Run #13
Lower Baker River dam construction 1925-02-18
Lower Baker River dam construction 1925-02-16
Lower Baker River dam construction 1925-02-22
Lower Baker River dam construction 1925-03-01
Lower Baker River dam construction 1925-02-26
Lower Baker River dam construction 1925-03-17
Lower Baker River dam construction 1925-03-14
Lower Baker River dam construction 1925-03-04
Lower Baker River dam construction 1925-03-18
Lower Baker River dam construction 1925-03-14 South End of Excavation for River Wall of Power House
Lower Baker River dam construction 1925-03-07
Lower Baker River dam construction 1925-03-20
Lower Baker River dam construction 1925-03-18
Lower Baker River dam construction 1925-03-10
Lower Baker River dam construction 1925-03-20
Lower Baker River dam construction 1925-03-16
Lower Baker River dam construction 1925-02-28
Unidentified man in uniform
Aerial view of mountain crater
Woman and child on bicycle
Men in military uniform
Men on horseback
Skiiers
Album Cover
Page 3
Page 6
Page 7
Page 2
Page 3
Page 5
Page 8
Page 9
Page 8
Page 9
Page 11
Page 12
Page 1
Aerial view of mountain range
Men on horseback
Sea plane
Sea plane
Two children
Group pose with vehicle carrying skis
Campsite near Chain Lakes
Seattle's "Hooverville"
Child with goats
View from cabin to snow
Rock climbers
Aerial view across clouds to mountain range
Climbers on ice face
Skiing
Snow covered cabin
Sea plane
Wooden cabin
Cabin in snow
Man in military uniform
Negative copy of image in watercolor of cemetery scene showing gravestone of James (a.k.a. Jimmy) Tilton Picket, among tall trees
View from 12th street, Fairhaven, Bellingham, WA, towards Bellingham Bay and Pacific American Fisheries facilities where a ship is docked
View from Sehome Hill of early Sehome, WA, with dirt track of Elk Street extending from lower right, Bellingham Bay on left
The Bellingham Hotel (now Bellingham Towers)seen from the intersection of West Champion and Grand Streets with the Hotel Rockwood and Peoples Market below, and Mount Baker Theater in background
Starboard view of large ship with tugboat in unidentified harbor
View from Sehome Hill of early Sehome, WA, with dirt track of Elk Street extending from lower right, Bellingham Bay on left
Negative image of gravestone of James Tilton Pickett engraved on the front as follows: "Born December 31 1857 - Died August 28 1889" and on the side: "Rest in Peace"
Soapy Smith Story - Dedman's Photo Shop, Skagway (Alask.)
View of small, wooden structure with wood planks serving as a walkway across grass yard in front of building.
Two men and two Boyscouts on board a ship
Three men standing in grassy airfield posing for photograph
Man wearing native-Alaskan outfit standing with harnessed sled-dogs on street
Unidentified men, women and children dressed in their good clothes standing in line outside of a photograph studio
Front view of fruit store with man and woman wearing white aprons standing in front of store beside tables of fruit on display.
View of Lake Whatcom, WA. from out on lake.
Federal Condensed Milk Co. building showing both truck and horse-drawn wagon delivery vehicles
View of Johnson Building on the northest corner of 1st St. and Pine St. in downtown Mt. Vernon, WA
Diehl and Simpson Ford automobile dealership storefront
Interior view of grocery/dry goods store
Carnation Condensery No. 4
1921 Peace Arch opening , Blaine, Washington
Early aviator L. Guy Mecklem
FEDERAL CONDENSED MILK CO.
Two men seated in stripped-down automobile (possibly Mount Baker Marathon contestants)
A man in overalls standing in a field among haystacks
Front-portside view of the steam tender "Rodoma" with man standing on foredeck
View of shoreline and industries in Fairhaven (Wash.)
Laundry delivery truck (Sedro Woolley Steam Laundry)
A truck advertising electrical power and water supply systems for homes
Lower Baker River dam construction 1925-02-18
Lower Baker River dam construction 1925-02-15
Beauty of Austria and Friendship
Lower Baker River dam construction 1925-02-12
Lower Baker River dam construction 1925-02-22
Lower Baker River dam construction 1925-02-14 Knife Edges for Sluiceway Gates
Lower Baker River dam construction 1925-02-20 Reinforcing Steel over Sluiceways
Lower Baker River dam construction 1925-02-18 Run #19 - Square sluiceway boxes?
Lower Baker River dam construction 1925-02-15 Forms for Run #16
Lower Baker River dam construction 1925-02-15 Forms Set for Run #16
Lower Baker River dam construction 1925-02-20
Lower Baker River dam construction 1925-02-18
Lower Baker River dam construction 1925-02-14 Run #15
Page 88
Page 89
Lower Baker River dam construction 1925-05-10 Grounding Cones #2 Unit
Lower Baker River dam construction 1925-05-10 Foundation Steel D.F. 1N
Lower Baker River dam construction 1925-05-22 Steel in Generator Foundation Wall
Lower Baker River dam construction 1925-06-02 Setting Forms for Run #121 El.324.3

Pages