Refine

Date

1924 - 1930
(years)
Specify date range: Show
Format: 2020/04/10

Type of content

Genre/form

Object custodian

Result Limit
  • CSV Spreadsheet
  • RSS Feed
(61 - 80 of 1,482)

Pages

Lower Baker River dam construction 1924-08-25 Diversion dam
Lower Baker River dam construction 1924-08-23 Coffer dam
Lower Baker River dam construction 1924-08-30 Railroad
Lower Baker River dam construction 1924-08-29 Site preparation for staging area
Lower Baker River dam construction 1924-09-13 Access railroad
Lower Baker River dam construction 1924-08-22 Coffer dam
Lower Baker River dam construction 1924-09-06 Coffer dam
Lower Baker River dam construction 1924-09-23 Upper Cofferdam during flood
Lower Baker River dam construction 1924-09-09 Construction activity at dam site
Lower Baker River dam construction 1924-09-17 Excavation at dam
Lower Baker River dam construction 1924-09-17 Concrete form
Lower Baker River dam construction 1924-09-09 Material Storage (drainage)
Lower Baker River dam construction 1924-09-18 (signal sign)
Lower Baker River dam construction 1924-09-17 Form construction
Lower Baker River dam construction 1924-09-19 (warning sign)
Lower Baker River dam construction 1924-09-23 Post flood
Lower Baker River dam construction 1924-11-19 Railroad trestle along river
Lower Baker River dam construction 1924-11-19 Damaged timber
Lower Baker River dam construction 1925-01-13 Lower Coffer Dam
Lower Baker River dam construction 1925-01-16

Pages