1899-07-03 Board called to order at 2PM. Present Jere Neterer and Frank C.
Teck. Architect A. Lee presented his first estimate of the work already
performed by the contractors Munro, Blake and Haskill in placing the
heading and ventilating apparatus in the building. It was as follows: New
Whatcom Wash July 1st 1899 To the Hon board of Trustees of the State Normal
School at New Whatcom. Gentlemen - In accordance with the terms of the
contract between the state of Washington and Munro, Blake and Haskell for
heating and ventilating apparatus, I hereby certify that I have estimated
the work as follows: Excavation and brickwork - $200.00; Heat and
ventilating registers - $550.00; Pipe coils made up - $500.00; Total to
this date - $1250.00. According to the terms of the contract the
contractors are now entitled to the above amount less 20 percent -
$1000.00" Estimate No. 1. A. Lee Architect. On motion the estimate was
allowed and the following voucher was ordered certified to the state
auditor that a warrant might issue. Voucher No. 39 - favor of Munro, Blake
and Haskell $1000.00 for 80% of the architects first estimate of work
performed on contract for heating and ventilating Normal School. Heating
fund. Board adjourned. Record approved. L.H. Darwin, clerk. Jere Neterer,
chairman.
WWU Board of Trustees meeting minutes for July 1899
Volume 01 - Page 089
1899-07-17 Board met at the Normal School grounds and carefully inspected
the building and grounds and all the work in progress on them and that
which was completed ready for their acceptance. They were called to order
at 4PM, present Neterer, Edens and Teck. An order was made for the purchase
of materials and the hiring of labor for the construction of the following
appliances asked for and recommended by Principal Mathes. For Room I in the
science department - table with hood over it to have connection with an
individual (?) to let off the poisonous gases. Chemical case, 3 tables for
chemical room 9x5. For room 2 Science department: 4 tables of fir, physical
apparatus case 18 feet long equipped with locker and doors. First room -
first floor - an instrument case. The black board in this room recommended
moved room below. In the library - 3 cases for books and a magazine case
for adjoining room. Supt. Mathes reported that shades were not needed on
the windows in the science room and the clerk was instructed to see B.B.
Furn. Co. and if possible have them stricken from the school's order for
shades. It was decided to pay the laborers on the grounds 25 cents per
hour. The fence around the grounds was reported completed as per contract
and was accepted by the board. The clerk ws instructed to issue a call for
bids for constructing a sewer connection-
WWU Board of Trustees meeting minutes for July 1899
Volume 01 - Page 090
1899-07-17 from the building to the High Street sewer at the intersection
of Pine; also for the construction of a sidewalk from the building to the
same street intersections following is the call as ordered published in the
Blade for one week. It was decided to floor and furnish the windows of the
hall just plastered on the second floor and finish complete for occupancy
the two rooms adjoining. The cost of placing the electric light fixture
necessary in the building was estimated by the Electric Light Company at
$76.85 with chandeliers $20.00 additional. The chairman was authorized to
ascertain the cost of the fixtures desired by Prof Mathes and Eply in the
library, laboratory and museum. Chapman Bros and Co. of Seattle were
ordered notified that the building would be ready to receive the furniture
ordered from them by August 1st. The clerk was ordered to ascertain the
cost of making the Gas Connections. The chairman ws authorized and
empowered to act in the matter. The plastering of the two rooms and hall on
the second floor ws reported completed. After inspection it was accepted
and ordered paid for out of the funds raised by popular subscription to
purchase the Collins Museum. The amount $195.10-
WWU Board of Trustees meeting minutes for July 1899
Volume 01 - Page 091
1899-07-17 the century dictionary was reported as having arrived. The
following vouchers were ordered passed to the state auditor that warrants
might issue. Voucher No. 40 - In favor of L.H. Darwin for $25.00 for
services as clerk of board trustees from June 15 to July 15. Maintenance.
Voucher No. 41 - favor B.B. Imp . Co. $197.37 for lumber furnished the
school Grading grounds fund. Voucher No. 42 - favor J.S. Shockey for $12.87
for labor on school. Grading grounds fund. Voucher No. 43 - favor Fawcets
Bros $6.85 for material furnished school grading grounds fund. Voucher No.
44 - favor D.H. Tracy $12.25 for labor on school grounds grading grounds.
Voucher No. 45 - favor J.S. Shockey $40.00 for full payment for building
fence around grounds as per contract. Grading grounds. Voucher No. 46 -
favor H.C. Hooper $80.25 for final payment for one complete set Century (?)
and cyclopedia. Library fund. Board adjourned. Record approved. L.H.
Darwin, clerk. Jere Neterer, chairman. 1899-07-24 Board called to order at
2:40PM - present trustees Neterer Edens and Tick. The clerk laid before the
board bids for the construction of the sewer connection and the sidewalks
within the grounds as follows: for construction of sidewalk. W.P. Johnson.
Amount of bid $34.50; J.S. Shockey. Amount of bid $25.00.
WWU Board of Trustees meeting minutes for July 1899
Volume 01 - Page 092
1899-07-24 Daniel Rosh - amount of bid $35.00; H.G. van Reypen and W.E.
Likins amount of bid $25.00; Moran Bros. amount of bid $2 per m; for
construction of the sewer C.W. Stoddard $210.00; W.e. Likins and H.G. Van
Reypen $139.95; Chas E. Lind $200.00; Moran Bros $185.00; Geo Hartness
$238.70; John Kelly $150.00. After discussion the consideration of the bids
was laid over until the next meeting. The question as to how the school
might get the benefit of the existing premium on state warrants brought a
motion from Mr. Edens that the board pay cash here after instead of
warrants. Mr. Teck moved as an amendment that the chairman draw up a
resolution covering the question and the motion as amended prevailed.
Following is the resolution as adopted by the board: whereas by a recent
decision of the supreme court of the state of Washington declaring
in-operative an act of the legislature of the state of Washington
authorizing the investment of certain school funds of the state of
Washinton in General fund warrants of the state and whereas the general
fund warrants of the state are at a premium; and whereas it is necessary
for this board to make sundry and diverse expenditures in and about the
State Normal School building located in New Whatcom Washington and in
charge of this board for which no appropriation has been made; and whereas,
the board has contracted to pay sundry and diverse obligations in cash; and
whereas the (?) of claims contracted for by the-
WWU Board of Trustees meeting minutes for July 1899
Volume 01 - Page 093
1899-07-24 Board to be paid in cash, by warrants would pay to the persons
to whom said sums are due an amount in cash over and obove the contract
price; and whereas it is the desire of the board to save for the benefit of
the Normal School the premiums which can be realized upon the state
warrants. Now therefore be it resolved that it is the (?) of this board to
pay to the persons having claims against the board the amounts thereof in
cash instead of authorizing the delivery of a state warrant for the sums
due and thus save to the board and the said school thereby the premiums
which can be realized upon said warrants. Therefore be it further resolved
that the chairman and clerk of this board are hereby authorized and
instructed to make such arrangements as may be necessary to carry out the
intentions of the board in the premises. Record approved. Board adjourned.
L.H. Darwin, clerk. Jere Neterer, chairman. 1899-07-25 Special. Board met
of chairman Neterer - present trustees Neterer, Edens and Teck. The
consideration of the bids for the construction of the sewer connection ws
proceeded with. The bid of H.G. van Reypen and W.E. Likins in the sum of
$139.95 ws found to be the lowest and on motion of Mr. Edens it was awarded
them the contract at their bid. A bond of $100.00 for fairthful performance
was ordered exacted from them. The bid of Van Reypens and Likins for the
construction of the sidewalk within the grounds-
WWU Board of Trustees meeting minutes for July 1899
Volume 01 - Page 094
1899-07-25 the sum of $25.00 was also accepted and contract awarded them.
The chairman and clerk were authorized to execute the contract and bond in
behalf of the board with the successful bidders. The clerk ws instructed to
notify the successful bidders of the acceptance of their bids and to return
to the unsuccessful ones the certified checks and cash which accompanied
their tenders as evidences of good faith. Board adjourned. Record approved.
L.H. Darwin, clerk. Jere Neterer, chairman. 1899-07-31 Special. Board met
at 3PM present trustees Neterer, Edens, and Teck. The clerk read a
communication from janitor McBride asking for a raise in his salary and for
extras compensation for the months of May, June, July and August. In motion
of Mr. Edens he was allowed $15 per month extra for the months of June and
July amounting to $30.00 in all. It was ordered that the telephone company
be instructed to place a phone in the building and the chairman and clerk
were authorized to execute the contract. The following bills were allowed:
Voucher No. 49 - in favor of J.A. McBride $41.66 for services as janitor of
the school building month ending July 31st. Maintenance. Voucher No. 48 -
In favor E.T. Mathes for salary $166.66 and expense account $26.30 for
July. Maintenance. Voucher No. 49 - favor F.W. Eply $10 for expense account
for July. Maintenance. Voucher No. 50 - favor Blade Pub. Co. $4.10 for
publishing call for bids and local (?). Maintenance.
WWU Board of Trustees meeting minutes for July 1899
Volume 01 - Page 095
1899-07-31 Voucher No. 51 - favor W.M. Frizzell Hardware Co. $3.86 for
hardware supplies furnished the school as per bills July 13th 19th 20th
24th 28th. Grading grounds. Voucher No. 52 - favor B.B. Imp Co. $141.64 for
lumber furnished normal school bills of July 19th 20th. Grading. Voucher
No. 53 - favor John Kelly $40.37 for 161 1/2 hours labor at 25 cents per
hour. Grading Grounds. Voucher No. 54 - In favor E.R. Croft $5.00 for
hauling lumber to the school. Grading grounds. Voucher No. 55 - in favor
Albert Hansen $4.50 for labor on school building. Grading grounds. Voucher
No. 56 - favor John Carlson $4.50 for labor on school building. Grading
grounds. Voucher No. 57 - favor A.R. Campbell $14.00 for services as civil
engineer. Grading grounds. Voucher No. 58 - favor J.A. McBride $30 for
extra compensation as janitor for months of June and July. Grading grounds.
Vouchers No. 59 - favor Fawcett Bros $23.45 for hardware, garden seeds and
etc. Grading grounds. Voucher No. 60 - favor Whatcom Falls Mill Co. $105.54
for lumber furnished the school for furniture. Furniture fund. Voucher No.
61 - Favor Morse Hardware Co. $3.45 for hardware supplies furnished the
school, bills July 10th - 24th. Furniture. Voucher No. 62 - favor Jas. T.
Sutherland $50.00 for five oak tables. Furniture. Boucher No. 63 - favor
(?) Larbox $24.30 for labor in making furniture for the school. Furniture.
Voucher No. 64 - favor Chas Tinderman $24.30 for labor in making furniture
for the school. Furniture. Boucher No. 65 - favor W.H. Tower $27.00 for
labor in making furniture for the school. Furniture. Voucher No. 66 - favor
J.S. Shockey $29.55 for labor in making furniture for the-
WWU Board of Trustees meeting minutes for July 1899
Volume 01 - Page 096
1899-07-31 school. Furniture. Board adjourned. Record approved. L.H.
Darwin, clerk. Jere Neterer, chairman.
##