WWU Board of Trustees meeting minutes for November 1896WWU Board of
Trustees meeting minutes for November 1896
Volume 01 - Page 041

1896-11-06 Board met at 10AM pursuant to call of the chairman, with all
members, the clerk and architect Skillings present. The minutes of the
meetings of Oct. 1 and Oct. 9 were read and approved. Mr. Skillings
presented and read his reply to the communication of Supt. Lee, referred to
us the record of the meeting of Oct. 1, relative to alleged deviations from
the specifications. He also presented and read his reply to the resolution
of Mr. Higginson, which is a part of the record of the meeting of Oct. 1.
Both communications were ordered filed and the resolution referred to was
withdrawn by Mr. Higginson with the consent of the board.


WWU Board of Trustees meeting minutes for November 1896
Volume 01 - Page
042

1896-11-06 A proposition was submitted by J.W. Montague and W.S. Quinby to
wire the school building for a program clock, each room to be wired
separately for $10.00, to cover expenses for labor and wire. The offer was
accepted. Mr. Skillings presented the 11th monthly estimate in favor of the
contractor which estimate bears date Nov. 6 and is as follows: Metal work
$450.00; Plastering 801.00; Mill work and glass 704.00; Carpenter work,
lumber, shingles 14 780.00; Granite work and brick work, pressed and common
750.00; Stone work 153.90; Tin and copper work 100.00; Plumbing 600.00;
Painting 75.00; Sewer work 75.00; $4488.90. Extra stone work on
foundations, 63 p. @ $2.70 170.10; $4659.00. (Signed) Skillings and Corner
W.P.S.  The estimate was approved and vouchers were ordered certified to
the state auditor for the issuance of warrants in payment of claims allowed
as follows: Voucher No. 53. Favor of A. Lee. $59.00 for 14 3/4 days service
as building superintendent during month of October. Voucher No. 54. Favor
of W.B. Davey, $3169.12, being 80% of 11th monthly estimate in building
contract, less $592.10 temporarily retained, and $170.10 for 63 (?) of
extra stone work. The question of necessary excavation and filling about
the building was discussed and the board decided to engage Engineer A.R.
Campbell to make an estimate of the amount of earth and rock in the
excavation to be made and the cost of doing the work. It was then noon and
a recess was taken for lunch. In the afternoon the board met at the
building with Engineer Campbell present, and after a careful examination
directed him to make an estimate of the amount of earth and rock in the
rear of the building, above the grade line, from a sistance of thirty feet
back from the wings and forty feet from the north wing to the back line of
the 30-ft (?)-


WWU Board of Trustees meeting minutes for November 1896
Volume 01 - Page
043

1896-11-06 the corner to be circular instead of right-angled and the (?)
to have a proper slope. He was directed to make a drawing of the proposed
work and report to the clerk as soon as possible. The board then returned
to the meeting place and after some discussion as to the best manner of
doing the work requested the chairman to confer with Mr. John Breckenridge,
of Fairhaven, and obtain his opinion as to the comparative cost of doing it
by (?) or day labor. Adjourned. Approved Dec. 7. O.H. Culver, clerk. Eli
Wilkin, chairman. 1896-11-10 Board met at 2PM pursuant to call of the
chairman with all members and the clerk present. The clerk presented the
report submitted by Engineer Campbell estimating the amount of excavation
within the limits designated in the record of Nov. 6 at 323 cubic yards, 2
30 yards being earth and 800 yards rock, he estimated the cost of the earth
work at 13 cents per yard and of the rock work at 60 cents, making a total
approximate estimate of $795.90. The report was ordered filed. The chairman
then stated that he had conferred with Mr. Breckenridge as requested and
that Mr. Breckenridge had stated that he would visit the premises and
report his opinion personally to the board, if desired. The clerk was
directed to request his presence and did so. Upon coming before the board
he examined the engineer's drawing and estimate and stated that from his
examination of the proposed work he was of the opinion that the cost by
efficient day labor would (?) little, if any, exceed the cost by contract,
while it would leave the board free to stop the work at any time. After
some further discussion of the matter, Mr. Breckenridge, at the request of
the board, submitted in writing a proposition to superintend the work, hire
the labor and furnish all the necessary tools and render a detailed account
to the board once a week for $5.50 per day, on the basis of ten hours work,
the said sum to be payable in warrants and all the labor employed and (?)
on this material furnished to be paid for in the same manner, the laborers
employed to be hired at the lowest price-


WWU Board of Trustees meeting minutes for November 1896
Volume 01 - Page
044

1896-11-06 consistent with good service. The proposition was accepted and
communication ordered filed, and the clerk was directed to notify Supt. Lee
and contractor Davey and request the contractors to so arrange the
remainder of the work as to interfere as little as possible with the work
of Mr. Breckenridge. Voucher No. 55. Was ordered certified to the state
auditor for the issuance of a warrant or warrants for $592.10 in favor of
W.B. Davey, that being the amount temporarily withheld from the 80% of the
11th monthly estimate on building contract allowed Nov. 6. Adjourned.  O.H.
Culver, clerk. Eli Wilkin, chairman.


##