Pages
-
-
Lower Baker River dam construction 1925-09-04 Runner Turbine #1N
-
-
Bellingham Plywood Corporation
-
-
Formally dressed group of men pose for photograph
-
-
Square white two story building on the Bellingham/Fairhaven waterfront with a hoist beside it close to the water.
-
-
Northwestern Shipbuilding Company - new wooden platform with shipways on it in foreground
-
-
Page 32
-
-
Bellingham Post Office shortly after construction in 1912
-
-
Close-up view of parade float in shape of boat named "Service", adorned with tulips
-
-
Lower Baker River dam construction 1925-06-02 Forms for Run #121 El.324.3
-
-
Page 12
-
-
View from shore of three-masted vessel at Nelson Lagoon, Alaska, with warehouse on land opposite
-
-
Page 1
-
-
Manicured gardens of Pacific American Fisheries facilities with Harris Avenue on right, extending eastward with Fairhaven Hotel in distance
-
-
Portrait of Mr. William J. Suffel
-
-
Lower Baker River dam construction 1925-05-31 Interior car #D.L.W.12996
-
-
Marching band assembled on sports field with crowded grandstands in background
-
-
Fairhaven High School football team
-
-
Lower Baker River dam construction 1925-06-12 Conduits Power House to 2nd Floor E. Side
-
-
Dutch colonial house, possibly 225 Middlefield Road in Edgemoor
-
-
Lower Baker River dam construction 1925-03-06
-
-
Lower Baker River dam construction 1925-08-29 Placing Concrete in Piers at Dam
-
-
Lower Baker River dam construction 1925-06-05 Exciter Base Form
-
-
Eighteen men in suits pose in three rows in wallpapered room
-
-
Bellingham Plywood Corporation
-
-
Northerly view of Fairhaven district's 12th Street with Fairhaven Hotel on right side of road in center of photograph, Bellngham, Washington
-
-
Lower Baker River dam construction 1925-10-05 Rock Surface Run #231 El.293
-
-
Page 33
-
-
Two women and an elderly man sit on logs with a picnic spread before them
-
-
Shoreline along quiet cove with forested bank in distance
-
-
Lower Baker River dam construction 1925-02-20
-
-
Unidentified group of men, possibly in downtown Bellingham, Washington
-
-
Page 6
-
-
Exterior of craftsman-style residence
-
-
Fairhaven High School football player
-
-
Lower Baker River dam construction 1925-08-09 Rock Surface Run #183 E. Side
-
-
Two finely dressed older women sit in front of hedge
-
-
Exterior of The Nelson Block, a two story stone commercial building built in 1900
-
-
Rotary Club of Bellingham
-
-
Warehouse and loading dock of Washington Egg & Poultry Association Co-operative in Lynden, Washington, under construction
-
-
Page 11
-
-
Crowds gather on Holly Street, Bellingham, WA, to watch parade of Tulip Celebration, including float covered in tulips and giant artificial tulips
-
-
Lower Baker River dam construction 1925-11-04 Lake Shannon (with railroad trestle)
-
-
Lower Baker River dam construction 1925-05-09 Steel S. Wall Power House
-
-
Lower Baker River dam construction 1925-08-25 Tail Race
-
-
Lower Baker River dam construction 1925-07-07 Tile Drain E. Wall
-
-
Lower Baker River dam construction 1925-06-02 Power House
-
-
Page 17
-
-
Lower Baker River dam construction 1925-07-02 Floor Forms 4th Floor
-
-
Front view of ivy-covered Fairhaven High School, Bellingham, WA
-
-
Lower Baker River dam construction 1925-07-01 Mucking East Side Dam Site
-
-
Lower Baker River dam construction 1925-05-19 Concrete Surface Run #108 El.280.5
-
-
Girl Reserves gathering
-
-
Washington State Band of Bellingham
-
-
A close-up of salmon tissue
-
-
Lower Baker River dam construction 1925-02-16 Trench in concrete
-
-
Crowd waiting to see Gunnar Anderson at John Hamrick's Music Box Theatre in Tacoma
-
-
Lower Baker River dam construction 1924-12-06
-
-
Lower Baker River dam construction 1925-09-11 Fish Ladder Excavation
-
-
Woman riding horse on mountain trail looks back at camera
-
-
Lower Baker River dam construction 1925-05-05 Power House Excavation
Pages