Pages
-
-
Lower Baker River dam construction 1925-10-06 Rock Surface Run 232 El.302
-
-
Lower Baker River dam construction 1925-11-10 Lake Shannon (with railroad trestle)
-
-
1947 Blue Barnacles
-
-
Crystal Falls on Whatcom Creek.
-
-
Native American beach encampment and canoes with Pacific American Fisheries cannery to left
-
-
The façade of the newly-constructed BPOE building is decked in bunting, with vacant lots on either side of building, Bellingham, WA
-
-
Woman in formal riding costume with jodhpurs and jacket stands next to horse
-
-
1971 Old Main
-
-
Motorized cannery machinery
-
-
Executives of Bloedel-Donovan Lumber Mill: J.H. Bloedel, Peter Larson, J.J. Donovan (copies from book)
-
-
Lower Baker River dam construction 1924-08-21 Dam Site- Upstream view of river
-
-
1976 Volleyball Team
-
-
New Whatcom, 1892
-
-
Page 92
-
-
1993 Stephanie Seibert
-
-
Small waves lap on shore with many driftwood logs scattered along beach, fishtraps extending into water on left
-
-
Lower Baker River dam construction 1925-06-15 2nd Floor Power House
-
-
Group of men, women, and one girl stand near small bonfire in woods
-
-
Page 54
-
-
First run of the Bellingham ferry, Victoria. View from deck of ship of large crowd gathered on Quackenbush Warehouse dock, with city of Bellingham, WA, in background
-
-
School children posing in front of school
-
-
Lower Baker River dam construction 1925-09-07 Reinf Steel Intake Foundation
-
-
1938 Frank Chorvat
-
-
Lower Baker River dam construction 1924-11-19 Railroad trestle along river
Pages