COVID-19 Symptom Attestation

  • CSV Spreadsheet
  • RSS Feed
(1 - 20 of 8,622)

Pages

Lower Baker River dam construction 1925-02-15
Lower Baker River dam construction 1925-02-26 Run #26 - Horizontal and vertical drains filled in with concrete
Lower Baker River dam construction 1925-03-17
Schooner Marguerite
Viking 1 design and development
Viking 1 design and development
Viking 1 design and development
1946 Library: Students Entering Front Door
Page 37
1983 WWU vs. Gonzaga
The "Tebenkof" about to be launched from Pacific American Fisheries boatyard
Methodist-Episcopal Church at Clinton and J Streets - Exterior corner view of church with steeple
Brailing salmon -- Pulling the net back to be reset.
Dilapidated barn and pasture
Unloading slamon from fishtrap into barge
Groundlevel view of water lapping on shore with cannery and small community in distance
Large cannery freight ship docked at Pacific American Fisheries cannery, Alaska
Pacific American Fisheries shipbuilding yard with several ships under construction
Steam vessels "Chippewa" and "iriquois" seen from end of long dock
View of inshore islands from deck of ship

Pages